CASE STUDIES:
Timber Frame Building Great Barwick Timber Repairs
click to view the enlarged images
Problem – Water ingress via. the studs, has decayed the hardwood timber beam, general wear and tear caused the lower edge of the beam to decay.
The remedy – The decayed timber was cut away, new oak was cut to size and bonded in place with CB10T SLOW SET. CB10T SLOW SET was injected into inaccessible areas, to ensure that voids were completely filled.