HomeSite MapData SheetsTechnical SupportApplicationsLinks
Order FormCase StudiesSafety GuideTrainingHow to find us

 

 

 

 


CASE STUDIES:

Timber Frame Building

Great Barwick Timber Repairs

  

  

click to view the enlarged images

Problem – Water ingress via. the studs, has decayed the hardwood timber beam, general wear and tear caused the lower edge of the beam to decay.

The remedy – The decayed timber was cut away, new oak was cut to size and bonded in place with CB10T SLOW SET.
CB10T SLOW SET was injected into inaccessible areas, to ensure that voids were completely filled.